Waste-to-energy technology platform coordinated commercially and strategically by BUCI TECH & CAPITAL LLC for qualified infrastructure projects. UGM Brasil is a strategic technology partner; all project, commercial and technical engagement is managed through BUCI.
The supplied technical proposal describes a modular gasification configuration designed to process municipal solid waste, generate synthesis gas and feed gas-powered electrical generators. Final performance, emissions, permitting, feedstock and economics must be validated site by site.

Project materials describe synthesis gas containing principally hydrogen (H₂), carbon monoxide (CO) and methane (CH₄).
Referenced configuration: two 1 MW generators plus two 500 kVA generators, powered by conditioned synthesis gas.
The supplied design includes process monitoring, controls and particle-filtration/capture systems. Environmental performance requires independent verification.
The technology supplier prepares the executive civil-works requirements for equipment foundations and installation; external storage, offices and other non-process facilities remain project-specific.
Referenced proposal includes five days of local staff training covering operation and maintenance.
Technical support is referenced for the first year, with detailed operation and maintenance documentation at completion.
Referenced full-system warranty: two years. Referenced execution objective: 120–150 days after contract, subject to site and contractual conditions.
Original project videos supplied to BUCI. Contact and commercial information of the technology partner is intentionally not published; all engagement is coordinated by BUCI.
Governments, municipalities, industrial operators, waste generators and investors can engage BUCI for project qualification, site assessment, financing architecture and technology deployment.